Not much of an update, but I just have to mount the fuse block, Hook up the wires to the speedo, power, ign. and grounds; as well as swap fuel pumps and figure out the fuel plumbing. Radiator is mounted temporarily until I can find out a better way.
Edit: I also got a cam,
DUR @ .004" 272*/280*
DUR @ .050" 210*/218*
LIFT .551 / .551
OVERLAP 52*
LSA 112*
I wonder what this thing will run in the 1/4 when I get finished?:hyper2: